How Inspektr works

From project creation to permit closeout. One workflow, same-day results.

Walkthrough video

See the inspection workflow in action

Watch the quick walkthrough before the step-by-step breakdown below.

Inspection options

Choose how to complete the inspection

Submit a guided recording for review, or use the Live Inspection Queue when your technician wants a real-time inspection call with an Inspektr inspector.

For contractors

Four steps from install to inspection review

01

Create a project

Enter the permit address, scope, municipality, and permit number. Select the trade and inspection type.

02

Assign your technician

Route the inspection to the right field tech. They get a trade-specific guided checklist for exactly what to capture.

03

Choose recording or live queue

Your tech can record a 3-8 minute guided walkthrough or join the Live Inspection Queue for real-time guidance from an Inspektr inspector.

04

Submit and track

Submitted inspections move to Under Review, and your tech sees the status change in the app. Live queue inspections are completed on the call instead.

Inspektr contractor portal projects list with next action, payment and project status for each job Inspektr inspection request screen with checklist, technician assignment and requested date Inspektr mobile app recording a roofing inspection with the checklist prompt on screen Inspektr mobile app My Inspections screen showing inspections under review

After submission

Licensed inspector reviews immediately

05

Inspector reviews the video

A Florida-licensed inspector watches the video and checks every item against a standardized code checklist. No scheduling, no site visit needed.

06

You get a documented result

Pass, corrections needed, or re-record request. If something needs fixing, you get specific notes on what to address. Everything is timestamped.

07

Report goes to the jurisdiction

The approved inspection report gets submitted to the building department for permit closeout. Full audit trail from recording to close.

Inspektr inspections list showing every inspection passed Inspektr inspection report prepared for the building department

The difference

7 days vs. under 1 hour

A routine AC changeout inspection. Same job, two very different timelines. With Inspektr, the contractor can submit a guided recording or use the Live Inspection Queue for real-time review.

Without Inspektr
MON
Install complete
TUE
Waiting on bldg dept...
WED
Waiting on bldg dept...
THU
Waiting on bldg dept...
FRI
Bldg dept shows up
MON
Report finally available
7 days
With Inspektr
8:00 AM
Install complete
8:10
Tech records video or joins live queue
8:15
Submitted for review
8:45
Inspector reviews
9:00
Inspection report generated
Under 1 hour

Ready to get started?

Tell us about your trade and volume, and we'll get you set up on your first inspection.

Tell us about your business

Tell us about your business

We'll reach out to walk you through how Inspektr works for your trade and volume.

No minimums. Scales from one branch to every brand you operate.

Before the inspection

The permit and the plan review run here too

The inspection steps below are the visible part of the process. Two stages come before them, and on most jobs they are where the time actually goes.

A

Permit prepared and filed

Documents checked for completeness, jurisdiction forms assembled, Notice of Commencement and product approvals where needed, filed within one business day with the F.S. 553.791(5) private provider notice.

B

Plan review

Inspektr performs the building code plan review in one to two business days. The jurisdiction then reviews forms and documents for completeness only, on a 10 business day statutory clock, or 5 for a single-trade review on a one or two family dwelling.

C

Rejections worked

If the jurisdiction returns comments, we prepare the correction and resubmit. Your office is not in the loop for it.

How it works: common questions

How does the Inspektr process work end to end?

Inspektr prepares and submits the permit within one business day, performs the building code plan review in one to two business days, and then performs the inspections virtually on demand. Inspection records go to the local building official within the 4 business days required by F.S. 553.791(14), and the certificate of occupancy runs on the statutory clock in F.S. 553.791(16).

Do I record the inspection or do it live?

Either. A technician can record a guided walkthrough for inspector review, or join the live inspection queue to complete the inspection in real time with an Inspektr inspector. Both satisfy the same statutory requirement; F.S. 553.791(9) provides that a private provider's inspection may be performed in person or virtually.

What if my technician will not use an app?

Send a guest link. It opens in a mobile browser with no install, which is the usual answer for subcontracted crews and for technicians who do not speak English comfortably.

What happens if a submission fails?

You receive specific correction notes, fix the item, re-record and resubmit. There is no re-inspection fee and no waiting for another county appointment.

Close permits the same day the work is done

Tell us about your business